Loading...

Critical Path update

by LAURA SHUMAKER January 16, 2014

Looking at the critical path outlined in the last post, I've completed the first step, validating the relaxing shoe concept, and begun the next step, scaling the lasts and patterns.

The most recent prototype made on Last 8 felt excellent during climb testing last week and passed the majority of tests I use to assess a prototype design, so I committed to grading Last 8 to Dan's size. Using scale factors derived from the slope of best fit lines from Army foot data (example graph below) and from Dan's foot measurements, I scaled up the CAD file, lasercut the new parts, and assembled Dan's last.

Data from: Kenneth R. Parham; Claire C. Gordon, and Carolyn K. Bensel (1992). Anthropometry of the Foot and Lower Leg of U.S. Army Soldiers: Fort Jackson, South Carolina — 1985. NATICK/TR-92/028. Natick, Ma: U.S. Army Natick Research, Development, and Engineering Center. (ADA261405) and: Kenneth R. Parham; Claire C. Gordon, and Carolyn K. Bensel (1994). Anthropometry of the Foot and Lower Leg of U.S. Army Soldiers: Fort Jackson, South Carolina — 1985. Electronic database. Natick, Ma: U.S. Army Natick Research, Development, and Engineering Center. (ADM000468)
Data from: Kenneth R. Parham; Claire C. Gordon, and Carolyn K. Bensel (1992). Anthropometry of the Foot and Lower Leg of U.S. Army Soldiers: Fort Jackson, South Carolina — 1985. NATICK/TR-92/028. Natick, Ma: U.S. Army Natick Research, Development, and Engineering Center. (ADA261405) and: Kenneth R. Parham; Claire C. Gordon, and Carolyn K. Bensel (1994). Anthropometry of the Foot and Lower Leg of U.S. Army Soldiers: Fort Jackson, South Carolina — 1985. Electronic database. Natick, Ma: U.S. Army Natick Research, Development, and Engineering Center. (ADM000468)

Now, I'm assessing methods for efficiently creating the graded patterns in 3D CAD and flattening them accurately.





LAURA SHUMAKER
LAURA SHUMAKER

Author


Leave a comment

Comments will be approved before showing up.


Also in Design Blog

Here's to further adventures...

by LAURA SHUMAKER September 20, 2016

View full article →

Update on our side project

by LAURA SHUMAKER April 16, 2016

View full article →

Working on a sweet little side project...

by LAURA SHUMAKER April 05, 2016

View full article →